Bigfoot tips & how-to animations

Click for full website
Bigfoot Systems® step 1 Step 1: Gather the tools required, trim the Bigfoot, cut your tube, clean tube edge, screw tube to Bigfoot base. You're on your way!
Watch Step 1
Movie length: 1 min 20 sec
Bigfoot Systems® step 2 Step 2: Place the footing form in the excavation, place earth around the base, backfill, then fill with concrete. You're done!
Watch Step 2
Movie length: 1 min 2 sec
Bigfoot Systems® tip 1 Tip 1: Using a utility knife, remove any fraying on the edge of the sono tube that will connect to the Bigfoot.
Watch Tip 1
Movie length: 13 sec
Bigfoot Systems® tip 2 Tip 2: Use batterboard to suspend a line over your work area. Tie red tape or string at equal increments to space out the Bigfoot forms evenly.
Watch Tip 2
Movie length: 12 sec
Bigfoot Systems®  tip 3 Tip 3: Cut two notches into the tube at the level that the concrete should reach. This easily allows you to avoid the problem of trying to estimate, as concrete will flow out of the tube when it's at the right height!
Watch Tip 3
Movie length: 20 sec
Bigfoot Systems® tip 4 Tip 4: Use a Bigfoot as a funnel when pouring the concrete into the mold!
Watch Tip 4
Movie length: 33 sec

Call 1-800-934-0393

top
©2012 - 2025 Bigfoot Systems®